HOME

HOME

HOME

CASE STUDY

CASE STUDY

CASE STUDY

गुणवत्ता आणि वचनबद्धतेद्वारे निकाल देणे

गुणवत्ता आणि वचनबद्धतेद्वारे निकाल देणे

गुणवत्ता आणि वचनबद्धतेद्वारे निकाल देणे

गुणवत्ता आणि वचनबद्धतेद्वारे निकाल देणे

Madaj–Narangwadi Road Project

Madaj–Narangwadi Road Project

Madaj–Narangwadi Road Project

Madaj–Narangwadi Road Project

As part of the MMGSY Package No. OSM-09, this project involved the upgradation of the T-03 road connecting Madaj, Sawalsoor, Babulsoor, and Narangwadi to the district border. Spanning approximately 17 kilometers, the project was executed in three key phases—CH 0/00 to 2/600, CH 2/900 to 9/500, and CH 10/200 to 18/00—ensuring seamless connectivity across rural areas in Omerga Block, Osmanabad District.

Balaji Constructions supplied premium-grade aggregates and washed sand, supporting the structural integrity and longevity of the road. The project enhanced rural connectivity and accessibility, directly benefiting local communities and agricultural logistics.

CLIENT

MMGSY – Maharashtra Mukhyamantri Gram Sadak Yojana

TOTAL ROAD LENGTH

17 KM

LOCATION

Omerga Block, Osmanabad District, Maharashtr

YEAR

2013

DURATION

2 Years

उच्च दर्जाचे बांधकाम साहित्य हवे आहे का?
आजच कोट मिळवा!

उच्च दर्जाचे बांधकाम साहित्य हवे आहे का?
आजच कोट मिळवा!

उच्च दर्जाचे बांधकाम साहित्य हवे आहे का?

आजच कोट मिळवा!

उच्च दर्जाचे बांधकाम साहित्य हवे आहे का?

आजच कोट मिळवा!

उच्च दर्जाचे बांधकाम साहित्य हवे आहे का?

आजच कोट मिळवा!

Balaji Constructions Copyright © 2025 All rights reserved.

Balaji Constructions Copyright © 2025 All rights reserved.

Balaji Constructions Copyright © 2025 All rights reserved.

Balaji Constructions Copyright © 2025 All rights reserved.

Balaji Constructions Copyright © 2025 All rights reserved.