HOME

HOME

HOME

CASE STUDY

CASE STUDY

CASE STUDY

गुणवत्ता आणि वचनबद्धतेद्वारे निकाल देणे

गुणवत्ता आणि वचनबद्धतेद्वारे निकाल देणे

गुणवत्ता आणि वचनबद्धतेद्वारे निकाल देणे

गुणवत्ता आणि वचनबद्धतेद्वारे निकाल देणे

SH-237 Infrastructure Upgrade (Lohara–Kasarshirsi)

SH-237 Infrastructure Upgrade (Lohara–Kasarshirsi)

SH-237 Infrastructure Upgrade (Lohara–Kasarshirsi)

SH-237 Infrastructure Upgrade (Lohara–Kasarshirsi)

This road infrastructure project involves the improvement of a 40.60 km stretch of State Highway 237 (SH-237) from Bembli to Kasarshirsi via Umaregavhan, Patoda, Lohara, and Narangwadi, reaching the Latur District border. The upgrade is being executed on EPC mode under the oversight of the Maharashtra State Infrastructure Development Corporation Limited (MSIDC).

The upgraded route will play a vital role in regional connectivity, facilitating better logistics, reducing travel time, and enhancing road safety. Balaji Constructions is supplying durable, high-quality aggregate materials to support the longevity and structural strength of this critical transport corridor.

CLIENT

Maharashtra State Infrastructure Development Corporation (MSIDC)

TOTAL ROAD LENGTH

40.60 km

LOCATION

SH-237 (Bembli to Latur District Border, via Lohara) – Osmanabad District

YEAR

2024 – Ongoing

DURATION

In Progress

उच्च दर्जाचे बांधकाम साहित्य हवे आहे का?
आजच कोट मिळवा!

उच्च दर्जाचे बांधकाम साहित्य हवे आहे का?
आजच कोट मिळवा!

उच्च दर्जाचे बांधकाम साहित्य हवे आहे का?

आजच कोट मिळवा!

उच्च दर्जाचे बांधकाम साहित्य हवे आहे का?

आजच कोट मिळवा!

उच्च दर्जाचे बांधकाम साहित्य हवे आहे का?

आजच कोट मिळवा!

Balaji Constructions Copyright © 2025 All rights reserved.

Balaji Constructions Copyright © 2025 All rights reserved.

Balaji Constructions Copyright © 2025 All rights reserved.

Balaji Constructions Copyright © 2025 All rights reserved.

Balaji Constructions Copyright © 2025 All rights reserved.